A10Z 2-300C

The Min. Shear & Comp. Loads for 81% isolation, CPM-Cycles Per Minute.
Qty Range Price/Unit Ships Within
1 - 24 8.27 8 wks
25 - 99 7.22 8 wks
100 - 249 6.52 8 wks
250 - 499 5.14 8 wks
500+ 0.0
1 - 24 8.27 8 wks
25 - 99 7.22 8 wks
100 - 249 6.52 8 wks
250 - 499 5.14 8 wks
500+ 0.0
$8.49
Product Specifications
Body Dia. 1
Body Length (W) 0.75
Comp. Forcing Freq. (cpm) 850 CPM
Material (Body / Fastener) Rubber-Zinc Plated Steel
Max Compression Load (lbs) 60 lbs
Max.shear Load 34
Min. Comp. Load @ Freq. (lbs) Not Rated lbs
Min. Shear Load @ Freq. (lbs) Not Rated lbs
Shear Forcing Frequency (CPM) 850 CPM
Stud Configuration 2(1/4-20)
Stock Call Us