Cart
A10Z 2-312D
The Min. Shear & Comp. Loads for 81% isolation, CPM-Cycles Per Minute.
Qty Range | Price/Unit | Ships Within |
---|---|---|
1 - 24 | 9.4 | 8 wks |
25 - 99 | 8.22 | 8 wks |
100 - 249 | 7.43 | 8 wks |
250 - 499 | 5.82 | 8 wks |
500+ | 0.0 | |
1 - 24 | 9.4 | 8 wks |
25 - 99 | 8.22 | 8 wks |
100 - 249 | 7.43 | 8 wks |
250 - 499 | 5.82 | 8 wks |
500+ | 0.0 |
$8.49
Body Dia. | 1.375 |
---|---|
Body Length (W) | 0.625 |
Comp. Forcing Freq. (cpm) | 3000 CPM |
Material (Body / Fastener) | Rubber-Zinc Plated Steel |
Max Compression Load (lbs) | 185 lbs |
Max.shear Load | 67 |
Min. Comp. Load @ Freq. (lbs) | 74 lbs |
Min. Shear Load @ Freq. (lbs) | See Catalog Page lbs |
Shear Forcing Frequency (CPM) | 3000 CPM |
Stud Configuration | 2(5/16-18) |
Stock | 48 |